The project was to develop a new Golf Course for the existing Peninsula Golf Club to relocate to. Dodd Civil Consultants were responsible for all Civil design work and contract administration for the main Civil contract.
THE PROJECT
The project included the Civil design for:
Strip and replace topsoil – 80,000m3
Bulk earthworks – 250,000m3
Sediment control
25km of subsoil drainage
31km of water supply pipes
500m of public road upgrading
Significant sewer and stormwater reticulation
Clubhouse carparking
Large culvert design
Pond design – ornamental and storage for irrigation, approximately 1Ha
The project also included:
Contract administration
Certification of payments
Certification of quality on Civil items
Ensuring construction met the programming requirements
CHALLENGES & SOLUTIONS
Maintaining construction to the required programme required input along with managing the onsite ground conditions which were typical for “Lime Country” with poor drainage. A separate part to this project was the creation of a 16 lot residential and 9 Lifestyle block subdivision alongside the golf course, constructed in conjunction with the golf course works. This project was delivered on time with the transition of the Golf Club following the required programme.