The project included the Civil design for: 
  • Strip and replace topsoil – 80,000m3
  • Bulk earthworks – 250,000m3
  • Sediment control
  • 25km of subsoil drainage 
  • 31km of water supply pipes 
  • 500m of public road upgrading 
  • Significant sewer and stormwater reticulation 
  • Clubhouse carparking 
  • Large culvert design 
  • Pond design – ornamental and storage for irrigation, approximately 1Ha
 
The project also included: 
  • Contract administration
  • Certification of payments
  • Certification of quality on Civil items
  • Ensuring construction met the programming requirements

 

CHALLENGES & SOLUTIONS

Maintaining construction to the required programme required input along with managing the onsite ground conditions which were typical for “Lime Country” with poor drainage. A separate part to this project was the creation of a 16 lot residential and 9 Lifestyle block subdivision alongside the golf course, constructed in conjunction with the golf course works.
This project was delivered on time with the transition of the Golf Club following the required programme.